Stick curtain wall plan details second floor is 0 second floor stick curtain wall system 1 second fl 12 0 roof 0 angle bolt glass insulation mullion water proofing flashing rigid slab insulation deck metal beam glazing gask lg.
Curtain wall intermediate floor detail.
See more ideas about curtain wall detail architecture details roof detail.
The bronze tee bar is bolted to the steel angles.
Since the curtain wall is non structural it can be made of lightweight materials thereby reducing construction costs.
Curtain wall systems must transfer back to floor structure or intermediate framing both their own dead load plus any live loads which consist primarily of positive and negative wind loads but might also include a snow load applied to large horizontal areas seismic loads maintenance loads and others.
Curtain wall and edge of slab fire barrier systems for single spandrel zero spandrel and steel back pan configurations hilti s vast library of firestop solutions ranging from traditional spandrel designs 100 vision glass or eifs are unrivaled in the industry.
Kawneer s curtain wall systems have been designed and engineered to meet these demands and more.
When glass is used as the curtain wall an advantage is that natural light can penetrate deeper within the building.
A muntz metal panel is used to cover the inside face of the curtain wall.
Assemble and glaze our stick fabricated traditional curtain wall in the field with inside or outside glazing options.
The steel structure is used to support the curtain wall at every floor slab.
The tee bar is plug welded to the continuous bronze mullions.
Unit tape structural part epdm setting break horizontal wjllion wjllion nsclatec class.
Unitized proven products and systems that offer the advantage of speed lower field installation costs and significantly improved quality control within a controlled shop environment.
Sep 17 2019 explore teerawut legcholayut s board curtain wall detail on pinterest.
The right side of the detail shows the condition at the window.
Curtain wall systems www kawneer co uk 5 today s fast paced construction schedules demand it all design innovation flexibility high quality fast installation simplified fabrication and superior performance.